Day Log/1876-09-21
On this day, two loaded timber trucks were being moved at Boston Lodge when the first pair left the rails and fell over causing the second to do the same. The fencing at the side of the line was damaged as were also one or two of the trucks. [1]
The reference quoted refers to location as Baslon Works. Given the location, it indicates immediately outside Boston Lodge
See also[edit]
References[edit]
- ^ Boyd, James I.C. (1975) [1959]. The Festiniog Railway 1800 - 1974; Vol. 2 Locomotive and Rolling Stock and Quarry Feeders. Blandford: The Oakwood Press. ISBN 085361-168-8. p574